Introduction of "New Factory"

  Please refer to "Transportation Information" for the location of the new factory.
  Until now, Mulberry tea was generally manufactured in a factory that incorporates the green tea manufacturing process as it is.
  We have decided to develop a manufacturing system that takes into consideration the characteristics of mulberry leaves in collaboration with a green tea manufacturing equipment manufacturer and introduce that system.
  The plant maker acknowledges that it is the first mulberry manufacturing plant in Japan.
  Initially, we planned to set up a factory in Hachinohe City. However, due to the restrictions of the urbanization control area, construction in the old city was abandoned, and it was unavoidably built in Hashikami Town.
  See below for photos of the exterior and equipment.




Steamer (front), pretreatment dryer (back)                  Finishing dryer